+234 806 319 7015  /  +234 803 532 0751
info@rotamondengineering.com
Finima, Bonny Island, Rivers State

Structural Maintenance of Offshore Oil Rig

Our team carried out a comprehensive structural maintenance operation on an offshore oil rig experiencing corrosion, metal fatigue, and surface deterioration.

Structural Maintenance of Offshore Oil Rig

Our team carried out a comprehensive structural maintenance operation on an offshore oil rig experiencing corrosion, metal fatigue, and surface deterioration due to constant exposure to harsh marine conditions. The project required precision, strict safety compliance, and a combination of surface preparation, welding, coating, and structural reinforcement procedures.

Client

John Ford

Category

Heavy Industrial

Duration

20 Mar 2025 – 20 Nov 2025

Budget

$40,000.00 USD

Project Scope

  • Rig-wide structural integrity assessment
  • Removal of rust, scale, and damaged metal sections
  • Grit blasting and surface profiling for coating adhesion
  • Welding repair and reinforcement of critical structural members
  • Application of marine-grade anti-corrosion and anti-fouling coatings
  • Final inspection and certification to offshore safety standards

Project Results

The rig's structural components were restored to optimal condition, significantly improving safety and operational performance. Reinforced joints and beams now offer greater load-bearing strength, while the new marine-grade protective coating system shields the structure from corrosion and saltwater damage. The maintenance work extended the rig's service life, reduced future repair costs, and improved the overall reliability of offshore operations.

Project Gallery

Have a Similar Project?

Tell us about your project and we'll get back to you with a tailored plan and quote.

Send Us Your Brief Now